- Description
-
Installation The battery can be mounted in any position so that the exchanger is easily accessible for inspection and cleaning. It is recommended to use a filter in front of the battery to prevent clogging of the heat exchanger. To protect the battery from freezing, it is necessary to install frost protection in the system. - Additional Information
-
Weight [kg] 9 Availability in 1-2 weeks Manufacturer Systemair Type of good heater battery Design water Design four-sided ducts Pipe dimension [mm] 500x250 - Download
-
- Reviews
-